My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC14113
DRMS
>
Back File Migration
>
Inspection
>
INSPEC14113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:15:35 PM
Creation date
11/18/2007 9:03:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977062
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Benson Brothers
Inspection Date
11/20/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />t. - -- - _ -- - -- - -- - - - -- <br />PROJ ECTlDENTIFICATION <br />Date : 19-Dec-2002 Permit or job no.: M-1977-062 Site :Hallenbeck Pit <br />User : SSS Abbreviation : none State :Colorado <br />Filename : M062-000 County :Delta <br />Agency or organization name : DMG <br />Permit or job action :Routine Reclamation Cost Estimate <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />N0. TASK DESCRIPTION USED SIZE HOURS COST <br />Ol a -Bac~ll vertical portion ofhighwall to 5:1 grade dozer 1 26.41 $4, 732 <br />02a -Revegetate 'critical' areas revege 2 40.0 $3,415 <br />026 -Revegetate regraded highwall area revege 2 20.0 $3,624 <br />03a -Transport reclamation equipment to/from site mobilize 5 3.0 $1,253 <br />016 -Cut and fill reduction of partially backfilled portion ofhighwall dozer 1 4.7 $849 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suerorALS: 94.1 $13,873 <br />• inUUdes inflation factor adjustment of <br />- _-~._-~ - -_ s, <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />/~A % TOTAL DIRECT COST • = $13,873 <br />-__-~___.__-_ ___. -. __ __ .-__--.. _______ _ _--__.___-J <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />1.55 <br />% of direct total = $215 <br />_ <br />%ofdirect total= $146 <br />_ <br />NA NA total = NA <br />of direct total = $1,387 <br /> 70TAL08P= $1,748 <br />CONTRACT AMOUNT (direU+08P)= ~ $15,621 <br />'not required (or eqp. operator serves as super) <br />1.05 <br />NA• <br />10.00 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $781 <br />CONTINGENCY- ~ NA• NA total= NA <br />'oonNngencies accounted brat task MVe! TOTAL INDIRECT COST= $2,529 <br />TOTAL BOND AMOUNT (direct+ indirect) _ $16,402 <br />r --- - - - - - - --- -- - - - -- - - - - --- - - -- <br />L -- - - -- -- -- -- --- - - - - -- - - - - - J <br />
The URL can be used to link to this page
Your browser does not support the video tag.