Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />The entire length of the.drainage below Pond_O11A was inspected.. This.was the fustinspection <br />of this area since spring runoff occurred in this drainage. Significant erosion has occurred in the <br />drainage that was previously repaired and stabilized. A gully up to 10 feet deep and <br />approximately 15 feet across has reformed in the same azea of concern below the Pond 011 A <br />emergency spillway. This location will need riprap or other permanent repair to prevent future <br />erosion. The mid-section of the drainage has also eroded in sections where gullies have formed <br />up to several feet deep. SCC has noted these same locations on the 2005 Rill and Gully Survey. <br />Please fill, regrade, and stabilize the erosion that has occurred and the gullies that have formed in <br />the drainage between Pond O11A and 011. <br />Backfill & Grading <br />Although there were no equipment operators active at the time of the inspection, SCC has made <br />good progress in backfill and grading the South Valora Pit and the Scraper Pit. The slide that had <br />occurred in the South Valora appeazs to be fully stabilized by pushing spoil material up against <br />the slide damaged azea. <br />