Laserfiche WebLink
Itl. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />cracks. The small area will be watched. No problems with slope stability were observed <br />at any of the other cut and fill slopes. <br />Drilline Projects <br />Several gob vent borehole locations were visited. In general, the drill sites were in good <br />condition after having gone through the winter months. Sites WD2-B, WD3-C, WD2-C <br />and WD1-B were inspected. The topsoil sign was down at site WD3-C. Some silt fence <br />maintenance will be needed at these sites, except for site WD2-C. <br />The operator is in the process of reclaiming the bum zone drill sites just west of the water <br />tank bench.-Silt fence is-in goad condition. 'Fhe sites have been-regarded. The eperator is <br />seeding and matting the steeper slopes. The drill road has water bars and straw bales at <br />strategic points. The reclamation operations at these drill sites aze looking very good. A <br />lot of effort is being put into this project. <br />The operator is planning on hiring someone for the summer to do maintenance work on <br />all drill sites. <br />Records <br />All of the records were incompliance. Please refer to the records checklist which is <br />attached. <br />c:/word/bowie2/insp0503 <br />3 <br />