Laserfiche WebLink
3. The operator failed to install storm water control ponds 4, 5 & b and their associated 06 / 30/ 06 <br />collection ditches as required by the approved surface water management plan. C.R.S. <br />34-32.5-116(4)(h) 8 (j) and Rule 3.1.6. ~ <br />PB or PV; P1~_ <br />TOPIC(S): ~ <br />4. The operator,failed to properly store <br />prevent, off-site damage in the eve <br />placed in areas with inadequate se< <br />unauthorized release of pollutants in <br />a <br />an active mine site so as to <br />diesel storage tanks were <br />construction to prevent an <br />07/ 15/ Ob <br />PB or PV: ~~ <br />TOPIC(S): I'Y f <br />5. The operator failed to clearly mark the permit area and affected area boundaries with 07 / 31 / O6 <br />monuments or markers that are clearly visible and adequate to delineate such boundaries. <br />Rule 3.1.12(2) <br />PB or PV: _P_B_ <br />TOPIC(S): -~M <br />b. The operator failed to stabilize and prdtect all surface areas of the affected land so as to 0 7/ 07/ Ob <br />effectively control erosion, specifically,~the roads were not being maintained as described <br />in the permit application by the application of Magnesium Chloride to prevent erosion. <br />C.R.S. p4-32,5-116 (4)(1). <br />PB or PV: 3fi_ <br />TOPIC(S): ~C_ <br />