Laserfiche WebLink
(Page 4) <br />MINE ID # OR PROSPECTING ID #: <br />INSPECTION DATE: n~m~ x <br />INSPECTOR=S INITIALS: A IW <br />The following problems (PB) and/or possible) violations (PV) (and suggested conective actions) were identified <br />during this inspection. The problems should be conected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. Ttie inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE(sl <br />1. The operator failed to protect areas outside the affected land from damage occurring 07/ 7 /06 <br />Burin mining or reclamation operations'and may have failed to minimize damage to the <br />hydrologic balance by using an unappr <br />set up a portable water pumping unit <br />wafer from fhe Middle fork of the Norf <br />116(4)(h) & (i). oved point of diversion, specifically, the operator <br />dutside of the approved affected area to divert <br />h Fork of the Soufh Platfe River. C.R.S. 34-32.5- <br /> <br />CORRE CTIVE ACTIONS <br />R_emovP_ the rnrtnble ni imp fmm its ohs I rvPd locntion and raclaim any disiurhancP <br />. ~ <br /> I <br />portable pump in Pond A as approved ir i the permit application or; submit an <br /> <br />amendment to the application that add I <br />s the additional affected area and <br />demonstrates approval from the State En gineer's Office to divert water from this location. <br />The operator failed to prevent disc I <br />inadequate containment or treatment o <br />has not properly installed the approved <br />with the approved application, Furt <br />malfunctionin by allowing leaka a an <br />34-32.5-116(4)j~i) and Rule 6.4.7(2)~c) rbances to the hydrologic. balance through <br />f processing wastewater, speafically; the operator <br />process water treatment ponds in accordance <br />hermore, ponds that have been installed ore <br />d loss of containment of the process water. C.R.S. <br />CORRE CTIVE ACTIONS: <br />Intinll the rrnnacc wntar rnnirnl cyciam nc ~tacigne~i nnrt nTnmvari in +ha~-+armit np~jrntinn <br />inch ~dingjnina <br />of any~nnds nr comnarti on of embankments ns nPressary to arPVent loss of <br />~ <br />;~nininmentnf the pwcess crater <br /> <br /> <br />2. <br />PB or PV:~1(_ <br />TOPIC(S): S.1!] <br />MP HB <br />07/ 07/06 <br />PB or PV; ~$_ <br />TOPIC(S): J~li <br />