(Page 3) * • <br />MINE ID # OR PROSPECTING ID # M-78-319 <br />INSPECTION DATE 11/17/00 INSPECTOR'S INITIALS ESC <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLBMS/POSSIBLH VIOLATIONS <br />AND <br />CORRBCTIVB ACTIONS <br />1. Boundary markers have only been partially posted at the Hewes <br />Pit. <br />CORRECTIVE ACTION: <br />Post additional markers at the site and submit proof in the form <br />of photographs by February 1, 2001. <br />2. The operator submitted revised maps of the site as required <br />during the Division's June 24, 1996 inspection, but were not <br />submitted in the form of a revision to the permit. <br />CORRECTIVE ACTION: <br />The operator will need to submit a letter to the Division <br />requesting these maps (dated August 3, 1998) be included in the <br />Mining and Reclamation Permit for the Hewes Pit. The Division <br />will waive the $188.00 application fee since the maps were <br />received by the Division prior to the adjustment of application <br />fees for 110 operations. <br />DATE <br />PB or PV:PB <br />TOPIC(S):SM <br />Februarv 1, 2001 <br />PB or PV:PB <br />TOPIC(S):MP <br />Februarv 1, 2001 <br />3. The Division holds a reclamation bond in the amount of $1,000.00. PB or PV:PB <br />C.R.S. 34-32.5-117(4)(c)(I)(a) states that the Board may increase TOPIC(S):FN <br />the amount and duration of a required financial warranty to reclaim Februarv 1, 2001 <br />the site. The Division's reclamation cost estimate based on the <br />site conditions and permit requirement totals $8,000.00. <br />CORRECTIVE ACTION: <br />The operator has the following options; <br />• Post an additional $7,000.00 bond by February 1, 2001, <br />• Complete some reclamation on site, or <br />• Revise the reclamation plan. <br />