My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC12655
DRMS
>
Back File Migration
>
Inspection
>
INSPEC12655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:14:24 PM
Creation date
11/18/2007 8:56:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990093
IBM Index Class Name
Inspection
Doc Date
2/12/2001
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
2/2/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
._ • (Page 31 • <br />MINE ID J! OR PROSPECTING ID # M-1990-093 <br />INSPECTION DATE 2-2-2001 INSPECTOR'S INITIALS SSS <br />The following problems IP61 and/or possible violations (PVI land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />Stormwater is discharging from the site when it is to be contained on site. 3-2-2001 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPICIS): HB <br />The operator will need to submit photographic documentation that this Stormwater _, _, _ <br />discharge has been stopped and is being contained on site. <br />2. One to two acres outside the permit boundary have been disturbed by product TBD by MLR Board <br />stockpiling operations and construction of a gravel conveyance pipeline. PB or PV: PV <br /> TOPICISI: OD <br />CORRECTIVE ACTION: , <br />Attend the March 21-22, 2001 meeting of the Mined Land Reclamation Board and <br />comply with any corrective actions, by the date specified, that may be ordered by the <br />board to correct this probable violation. <br />3. Mining is not being conducted per the specifications of the approved mining plan. 3-30-2001 <br /> PB or PV: PB <br />CORRECTIVE ACTION: TOPICISI: MP <br />Submit a revision to the permit proposing a mining plan and specifications that are _, _, _ <br />consistent with current site conditions and expected future mining operations. <br />Secure Division approval of the revision within appropriate timeframes specified by <br />statute. <br />I, Steve Shuey, hereby certify that on February 8, 2001, I deposited a true and complete copy of this foregoing inspection <br />report in the United States Mail, first class postage paid, to the operator of record for this site at the address indicated, <br />and to those others within the body of this report who have been designated to receive copies (DMG personnel excepted). <br />~' / "/~'> <br />Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.