Laserfiche WebLink
• <br />Do impoundments exist?y Are the following problems noted?_ <br />Pond Name and Location <br />Upstream slope: None, Riprap- missing, sparse, weathered, Cracks; <br />displacement-, Sinkhole-, Depression/Bulge-, Slides-, Other-. <br />Crest of Embankment: None Ruts/Puddles-, Erosion Cracks-; <br />displacement- Sinkhole-, Not wide enough-, Low area-, Rodent Burrows-, <br />Other <br />~~~ ~ ~~ <br />Downstream Slope: None ,Livestock damag _, Erosion/Gullies , <br />Cracks ;displacement ,Too Steep ,Depression/Bulges ,Slides-, Other. <br />Seepage: None ~/, In embankment At point source-, At toe-, Adjacent to <br />outlet-, Evidence of piping-, Other-. <br />Outlet: None , No outlet found-,Structure deteriorated-, Inoperable-, Conduit <br />deteriorated or collapsed-, Leaky valve-, Other-. <br />Spillway: None-, Erosion with headcutting_, Cracks-, displacement- ~ ~~ <br />Too small-, Flow obstructed-, Riprap_ missing, sparse, deteriorated, Othe ?( Yip,,, <br />/o~~e.- <br />Overall Condition: Good- Acceptable- Poor_ ~t~t D/~~ <br />Good: No conditions appear to threaten the safety of the dam and the dam <br />is expected to perform satisfactorily under designed conditions. <br />' Acceptabl ymptoms of structural distress (excess seepage, major <br />asp acements) which, if conditions worsen, could lead to failure. Continued <br />inspections and reduced storage capacity are recommended. <br />Poor: Definite signs of hydrologic inadequacy or structural distress (excessive <br />seepage, cracks, slides, sinkhole,severe deterioration), which could lead to the <br />failure of the dam if operated at full capacity. <br />(iii) The extent to which existing impoundments or earthen structures were constructed <br />and certified in accordance with prudent engineering designs approved in the permit; <br />as-builts exist end are they available? Where? <br />4 <br />