Laserfiche WebLink
!R <br />~~ <br />• (Page 3) • <br />MINE ID # OR PROSPECTING ID # H-I4R0-~Cfc <br />INSPECTION DATE_ 2~1O160 <br />INSPECTOR'S INITIALS tl~ <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTION <br />DATE <br />1) The financial warranty posted for the site may be 60 days after <br />insufficient to complete the reclamation plan. receipt of a notice <br />of insufficiency <br />The Division will estimate the current cost of completing <br />the reclamation plan for the site. If the re-evaluation PB or PV: PB <br />indicates that the financial warranty posted is insufficient, <br />the operator will be provided the details of the Division's TOPIC(s): FN <br />evaluation and notified that they have 60 days in which to <br />address the insufficiency pursuant to C.R.S. 34-32.5-117 (4). <br />CERTIFIED MAIL NO. 3~ 7~sS3S3 <br />RETURN RECEIPT REQUESTED <br />