Laserfiche WebLink
<br />• <br />The excavation limits are represented under Exhibit C - 4, and este6l:ish specific <br />minimum distances between the excavation and men-made structures or nutural features. <br />enhanced aquatic habitat. <br />Anomalies of lOx of the total length involved may occur where excavation breaches <br />the minimum setbacks, however, such anomalies will not exceed lOX of 'the required <br />setback distance. These setbacks, or buffers, are specified below: <br />* Adjacent property (i.e., permit boundaries) ~ 25 feet. <br />* Irrigation ditches = 50 feet. <br />* Residential buildings (unless a written agreement specifying closer distances exists) <br />= 200 feet. <br />* Colorado Southern Railroad 'and adjacent power line = 50 feet. <br />* Taft Hill Road 75 to 125 feet. <br />* Fort Collins Recreation Trail m 25 feet. <br />As indicated under Exhibit C - 1, Permit Boundary Changes, area 6 unt,er that exhibit <br />is a leased area. It contains several buildings that would be located within 200 feet <br />of the excavation as pFoposed under area G, phases I & II, as presented under Exhibit <br />C - 4, Hining Plan Map. At the time of this amendment, the leased area is up for sale: <br />No current written agreement exists with the present owner to allow mining within 200 <br />feet of their buildings. The operator will attempt to negotiate such an agreement with <br />the ultimate owner of the property prior to implementation of excavation of area G. It <br />no such agreement can be obtained prior to commencement of excavation of area G, in the <br />area requiring a written agreement, then a technical revision would be submitted at that <br />time which adjusts the excavation limits of area G to reflect a 200 fooC setback from <br />the buildings concerned. Excavation of area G is scheduled to commence in the year <br />2017 (refer to Table III, under this exhibit). <br />In area I, which is scheduled for completion of mining in 1987, past excavation did <br />occur within 200 feet of adjacent residential buildings. Excavation is now completed <br />within those areas, and no objections or complaints were filed with the operator, during <br />or after operations. Reclamation is scheduled to begin in 1988 for area I (refer to <br />Table IY, under Exhibit E). <br />. Where excavation will continue, a 100 foot undisturbed buffer will be maintained <br />between the excavation and the Cache La Poudre River. Again,'anoma:Liea of l0E of the <br />total length involved may occur where excavation breaches the minimum setbacks, however, <br />EXHIBIT D; PAGE 3. <br />