Laserfiche WebLink
Page 2 of 2. <br />TABLB II <br />ACRBAGB TOTALS BY PNASR FOR NBY ARBAS <br /> Total Buffer Rip- Acceae Special Area Pond <br />Area Acrea Area Rao Road Feature &ceration Aree <br />Area E: <br />Phase I 39.7 N/A N/A .8~ N/A 35.4 20,6 <br />Phase II 13.9 N/A N/A N/A N/A 13.0 8.1 <br />Phase III 15.6 3.9 N/A .9 N/A 11,3 .9 <br />• Area F: <br />Phase I 29.5 3.6 N/A .5 N!A 17.9 15.3 <br />Phase II 27.7 2.4 N/A .4 .8 inland 21.6 19.1 <br />Area C: <br />Phase I 34.0 N/A N/A .1 N/A 33.0 30.9 <br />Phase II 40.0 3.6 NIA .6 N/A 35.9 31.6 <br />Phase III 33.1 N/A N/A N/A N/A 28.7 25.5 <br />Area J: <br />Phase I 35.6 1.6 N/A .4 N/A 32.0 27.9 <br />Phasn II 47,4 1.5 N/A .4 N/A 43.2 29.0 <br />L J <br />• • ~ • <br />