Laserfiche WebLink
• .(Page 3) • <br />MINE ID # OR PROSPECTING ID # M-99-062 <br />INSPECTION DATE OS/11/00 <br />J <br />INSPECTOR'S INITIALS ESC <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLfiMS/POSSIBLH VIOLATIONS <br />AND <br />DATE <br />1. The Division was unable to locate a mine identification sign on _ <br />site. Rule 3.1.12 requires a sign be posted clearly visible PB or PV:PB <br />from the access road with the name of the operator, a statement TOPIC(S):SM <br />that a reclamation permit for the operation has been issued by Julv 1B, 2000 <br />the Colorado Mined Land Reclamation Hoard and the permit number. <br />CORRECTIVE ACTION: <br />The operator must post a mine identification sign clearly <br />visible from the access road with the name of the operator, a <br />statement that a reclamation permit for the operation has been <br />issued by the Colorado Mined Land Reclamation Board and the <br />permit number. Photographs of the posted sign must submitted by <br />July 16, 2000 demonstrating compliance. <br />2. A permit overlap exists between Quarry E (Permit No. M-86-115) <br />and the Hector Rodriguez Quarry (Permit No. M-99-062). <br />CORRECTIVE ACTION: <br />BMS and Hector Rodriguez will need to clarify this discrepancy <br />in the respective permits by July 18, 2000. The operator that <br />relinquishes the 0.5 acres will need to request a bond release <br />for that area to permanently remove it from the permit area. <br />PB or PV:PB <br />TOPIC (S):SM <br />Ju1v 18. 2000 <br />