My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC11809
DRMS
>
Back File Migration
>
Inspection
>
INSPEC11809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:13:45 PM
Creation date
11/18/2007 8:52:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
6/18/1996
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ (Page 3) <br />MINE ID # OR PROSPECTING ID # M-89-033 <br />INSPECTION DATE 6-18-96 INSPECTOR'S INITIALS GSC <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br /> CORRECTION <br /> DATE <br />1. Mining refuse was present in Stage I. 7-31-96 <br /> PB or PV PB <br />Corrective Action: No later than 7-31-96, all refuse TOPIC(S) RS <br />needs to be disposed of pursuant to Rule 3.1.5(5). <br />2. A portion of the erosion control berm along the eastern 8-30-96 <br />top edge of Stage X has been removed. A stockpile of PB or PV PB <br />fines located in Stage Z for reclamation has not been TOPIC(S) SC <br />graded and seeded. <br />Corrective Action: The erosion control berm in Stage X <br />needs to be reestablished and stabilized. The <br />stockpile of fines in Stage Z needs to be graded and <br />seeded or stabilized. <br />3. Above ground fuel tanks and oil drums are stored in an 8-30-96 <br />area without a spill containment structure. PB or PV PB <br /> TOPIC(S) AT <br />Corrective Action: These need to be enclosed within an <br />appropriate spill containment structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.