My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC11806
DRMS
>
Back File Migration
>
Inspection
>
INSPEC11806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:13:45 PM
Creation date
11/18/2007 8:52:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Inspection
Doc Date
2/13/1981
Doc Name
JANUARY 1981 INSPECTION REPORT 76-6
From
MLR
To
BLUE RIBBON LIMITED PARTNERSHIP
Inspection Date
1/28/1981
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. } ~ i <br />• • <br />UNOERGROUNO COAL MINE <br />INSPECTION REPORT <br />TYPE Of FIELD INSPECTION Partial DATE: January 28, 1981 <br />WINE: Sunflower Energy's Blue Ribbon Mine INSPECTOR: <br />T. Gillis <br />FILE N0: 76-6 <br />OPERATOR CONTACT: Bob Asher <br />General Obligations <br />Authorlxations to operate on file n/c <br />Property within area as mapped and bonded n/c <br />Mining plan being followed X <br />Bonding adequate readjusted 12/80 <br />Comments: <br /> <br />Signs b Narkers <br />Nine identification signs <br />Comments: <br />- I.D. sign OK <br />- Perimeter markers evident at some points but should be installed so that <br />a person standing at one marker can see the next one easily. In this <br />way, the perimeter line can be followed allr the way around the permit <br />area. Additional markers must be in place by February 28, 1981. <br />- Topsoil markers are on order. <br />Premining - Postmining Land Use <br />Comments <br />Baekfilling andand Gradin~- <br />Refuse-Spoil handiling procedures <br />Steep slope - material an downslope <br />Erosion-rills or gullies/erosion control <br />Toxic, acid forming or combustible material handling procedures <br />Comments: <br />- The MLRD Staff engineer will make an on-site visit sometime in February <br />to evaluate the slope failure problem and make recommendations on <br />how to best resolve the problem. See attached page for a description <br />of the existing situation. <br />- Drainage channel below portal bench was repaired in the two washed-out <br />sections. <br />- A drainage channel needs to be constructed along the Northern end <br />of the Mine bench. This should extend from the Northern end of the <br />face-up (near fan portal) to the inlet end of the PVC Pipe that leads <br />to the. lower sedimentation pond. This must be completed by February <br />18, 1981. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.