Laserfiche WebLink
'~ • (Page 31 • <br />MINE ID N OR PROSPECTING ID It M-85-115 <br />INSPECTION DATE 2-17-99 INSPECTOR'S INITIALS SSS <br />The following problems IPBI and/or possible violations IPVI land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1. A portion of the pit highwall is not sloped to a 2:1 grade, as required by a permit <br />commitment. <br />2. <br />3. <br />CORRECTIVE ACTION: <br />Regrade and maintain the pit highwall at a maximum 2:1 slope. Notify the Division <br />upon completion of the required highwall regrading. <br />CORRECTIVE ACTION: <br />CORRECTIVE ACTION: <br />CORRECTION <br />DATE <br />5-31-99 <br />PB or PV: PB <br />TOPIC(S): MP <br />BG, RS, <br />PB or PV: <br />TOPICISI: <br />PB or PV:_ <br />TOPIC(S) , _ <br />