My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC11509
DRMS
>
Back File Migration
>
Inspection
>
INSPEC11509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:13:33 PM
Creation date
11/18/2007 8:51:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987012
IBM Index Class Name
Inspection
Doc Date
2/7/2000
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
1/28/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (Page 3) <br />MINE ID rr OR PROSPECTING ID p M-87-012 <br />INSPECTION DATE 1-28-2000 <br />The following problems IPBI and/or possible violations (PV) land suggested corrective actions) were identified during this <br />inspection. The {problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />Pit slopes are not maintained at a 3:1 grade during inactive periods as committed to 3-31-2000 <br />in the approved permit. PB or PV: PB <br />TOPICISI: BG <br />CORRECTIVE ACTION: MP , _, _ <br />Reduce oversteepened pit slopes to a grade of 3:1 or less and submit photo- <br />documentation of the completed corrective action to the Division by the date <br />specified ~co the right. <br />INSPECTOR'S INITIALS SSS <br />2. Hazardous: materials (fuel) is stored on site in a tank that is not placed within an 3-31-2000 <br />adequate spill containment structure. PB or PV: PB <br />TOPICISI: AT <br />CORRECTIVE ACTION: _, _, _ <br />Either remove the fuel tank, or construct an adequate fuel containment structure and <br />place the tank within the structure. Submit photo-documentation of the completed <br />corrective action to the Division by the date to the right. <br />3. <br />CORRECTIVE ACTION: <br />PB or PV: <br />TOPICIS) <br />
The URL can be used to link to this page
Your browser does not support the video tag.