Laserfiche WebLink
A-E pit is active in Middle Flume drainage. Brushing ahead of the pit has <br />extended into Middle Flume drainage, consistent with the operation plan as shown <br />on Map M-9 of the permit. A brush dam for erosion control has been placed in <br />the bottom of the drainage downhill from the toe of the pit. <br />Page 9 <br />