My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC11258
DRMS
>
Back File Migration
>
Inspection
>
INSPEC11258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:13:18 PM
Creation date
11/18/2007 8:50:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
Inspection
Doc Date
6/19/2004
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
6/7/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Perminee/ WEST SLOPE CARBON Permit C-016-81 Field Visit 06/07/2004 CDntIIIHat1DD Page <br />Person Number Date <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Identified Elsewhere, 6=Previously Cited <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. 3 Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1._ Drainage Control <br />2._ Inspections & Certifications <br />3. Siltation Structures <br />4._ Discharge Structures <br />5. Diversions <br />6. Effluent Limits <br />7._ Ground Water Monitoring <br />8._ Surface Water Monitoring <br />9. Drainage -- Acid-Toxic Materials <br />10. Impoundments <br />11. Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1._ Removal <br />2. Substitute Materials <br />3,_ Storage and Protection <br />D. <br />Backfilling & Grading <br />1._ Exposed Openings <br />2._ Contemporaneous Reclamation <br />3._ Approximate Original Contour <br />4._ Highwall Elimination <br />5._ Steep Slopes (includes downslope) <br />6._ Handling of Acid & Toxic Materials <br />7._ Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1._ Placement <br />2._ Drainage Control <br />3._ Surface Stabilization <br />4._ Inspections & Certifications <br />Coat Mine Waste <br />(Refuse Piles/[mpoundments) <br />1._ Drainage Control <br />2._ Surface Stabilization <br />3._ Placement <br />4._ Inspections and Certifications <br />5._ Impounding Structures <br />Use Of Explosives <br />1._ Blaster Certification <br />2. Distance Prohibitions <br />3._ Blast Survey/Schedule - <br />4._Warnings & Records <br />5. Control of Adverse Effects - <br />E. <br />F. <br />G. <br />Performance Standard Categories E. Excess Spoil Disposal ...........................................{816/817.71-74) <br />30 CFR Counterpart 1. Placement .................................................................. .........................71(e) <br />A. Administrative ................................. ....................................... <br />773 <br />11 . 2. <br />3. Drainage Con[rol.............................._........._........... <br />SurfaceStabilization.............._._.............................. .._.._..................71(1) <br />....._ <br />. <br />.. <br />... <br />71(g) <br />I. ValidPertnit ..................._...................._..._... <br />2. Mining within Bonded Area .................. .................................. <br />. <br />..............................773.11 4. Inspections &Certifications...................................... .._. <br />... <br />. <br />.... <br />.........................7](h) <br />3. Terms & Conditions of Permit ............... ..............................773.17 F. Coal Mine Waste (Refuse Piles/Impoundmcros) , ,,,,(816/817.81-84) <br />4. Liability Insurance ................................. <br />5. Ownership and Control ......................... ........................._....800.60 <br />.............................778.13 <br />1. <br />Drainage Control ............................,........................ <br />..........................83(a) <br />6. Temporary Cessation .............................. 842.11(e)&816/817.131 2. Surface Stabilization_................_............................. .........................83(6) <br />7. AML Rec.Fees--Non-Respondent ....... .........................870.15(6) 3. Placement........._................_........._._.................._.. ......._........._.....83(c) <br />8. AML Rec. Fees -- Failure to Pa <br />y ............ 870.15 a <br />......................... () 4. Inspections and Certifications ................................... ........................83(d) <br /> 5. Impounding Structures.............................................. .............................84 <br />B. Hydrologic Balance ........................... ...........(816/817.41-57) <br /> G. Use of Explosives............................................. .....(816/817.61-68) <br />I. Drainage Control .................................... <br />2. Inspections&Certifications ................... .....................................45 <br />.........._..............49(a)(10) <br />I. <br />BlasterCertifica[ion................................................... <br />........................61(c) <br />3. Siltation Structures ................................. .....................................46 2. Distance Prohibitions................................................. ........................61(d) <br />4. Discharge Structures ............................. ......................................47 3. Blast Survey/Schedule............................................... ........................62-64 <br />5. Diversions ...................................:.......... .....................................43 4. Warnings & Records ................................................. .....................66 & 68 <br />6. Effluent Limits ....................................... .....................................42 S. Control of Adverse Effects........................................ .............................67 <br />7. Ground Water Monitoring ...................... ................................41(c) H. Subsidence Control Plan................................. ........(817.121-122) <br />8. Surface WaterMonitoring ...................... ................_..............41(e) f. Roads................................................................ .(816/817.150-151) <br />9. Drainage--Acid -Toxic Mattrials ........... ....................._.........41(f) <br />l0. Impoundments ........................................ ....................................49 1. Road Constmction..................................................... ......................150(c) <br />11. Stream Buffer Zoues .............................. ............................._......57 2. Certification.........._..._.............................................. .._....._............151(a) <br /> 3. Drainage ..................................................................... ..........150(6)-151(d) <br />C. Topsoil & Subsoil ............................... ................(816/817.22) 4. Surfacing and Maintenance........................................ ..........150(e)-151(d) <br /> <br />I. Removal .................................................. <br />................................22 a <br />() 5. Reclamation ............................................................... .......................150 <br />(t) <br />2. Substitute Materials ................................ .................................22(c) r. Signs & Markers ............................................. ..........(816/817.11) <br />3. Storage and Protection .................._........ <br />4. Redistribution .......................................... _..............._............ 22(c) <br />................................22(d) <br />1. <br />Signs.......................................................................... <br />...........11(a),(b),&(c) <br /> 2. Mazkers......._ ........................_............................._.._ I1(a),(b),(d),(e),&(f) <br />D. Backfilling & Grading .................... ..........(816/817.95-107) K. Distance Prohibitions...................................... .................(761.11) <br />]. Exposed Openings .....................816/817. 13, 14, 15, & 823.] 1 & 21 L. Revegetation..................................................... (816/817.111-116j <br />2. Contemporaneous Rec]amation ................ ..................................100 <br />3. Approximate Original Contour ................ ..........................102(a)(I) 1. Vegetative Cover........................................................ ...............111 & 116 <br />4. Highwall Elimination ............................... ..........................102(a)(2) 2. Timing........................................................................ ..........................113 <br />5. Steep Slopes {includes downslope) .......... ..................................107 M. Postmining Land Use.........--.............-.............. .......(816/817.133) <br />6. Handling of Actd & Toxic Mattrials ........ .............................. ]02(c) <br />7. Stabilization (rills and gullies) .................. ................................95(6) 2cviccJ December 4, 1998 Page 2 of <br />H. _Subsidence Control Plan <br />I. Roads <br />1. Road Construction <br />2. Certification <br />3._ Drainage <br />4._ Surfacing and Maintenance <br />5. Reclamation <br />J• Signs & Markers <br />1. Signs <br />2.~ Markers <br />K. _Distance Prohibitions <br />L. Revegetation <br />1. Vegetative Cover <br />2. Timing <br />M. _Postmining Land Use <br />N. Other <br />General <br />Performance <br />Category <br />A 1 ]) 1989 bond forfeiture site <br />
The URL can be used to link to this page
Your browser does not support the video tag.