Laserfiche WebLink
Q~~tiM ~ HFx~~Q <br />U. S. DEPT. OF THE INTERIOR ENT OFF T <br />~F'ICE OF SURFACE M~~~-~ ~ ~1 ~~ <br />RECD Mine Site Evaluation ~' <br />~~ <br />.,,N ~ +'~`` State Program JUN t ~ R~,r, `'F°FS~R6~°~~. <br />1. Permittee/Person ead~G,.. <br />WEST SLOPE CA {~~ tRMERPERMITTEE) <br />2. Address <br />C/O DMG,1313 SHERMAN, ROOM 2 I s <br />3. City 4. State <br />Denver CO <br />5. Zi Code 6. Phone Number <br />80203 (303)866-3567 <br />7. Operator Name, if Different than Permittee <br />1989 BOND FORFEITURE SITE <br />8. Mine Name <br />HAWKSNEST <br />9. Permit Number YiYlOitllYiMineraln~~wonurv10. Permit Type <br /> C-016-81 N~ <br />11. Field Visit Date 12. Purpose 13. SRA Present <br /> 06(07(2004 O~ ^Y <br />mm-dd -yyyy <br />14. Permit Status 15. Site Status 16. Facility Type <br />AB FR <br />17. OSM Office # 18. CCID # 19. Land Code <br />140 ~ ] <br />20. M.S.H.A ID # 21. State Abrev. 22. CovntyName <br /> CO GUNNISON <br />23. AVS Permittee En tity ID Number 24. State Office <br /> ~~ <br />25. Hours 26. Sig cure Block trVJ.-~/~./~ 27. Rev ewing Official: <br />~~ <br />p.0 a. Permit Review <br />Sig ah e: fe~l6~0Y Signature: <br />1.0 b. Site Visit Time <br />HENRY A TIN ID # 116 ,,,/ <br />4,0 c. Travel Time Review Date: L.ip ll ~7 ~ <br />Printed Name: mm - dd - yyyy <br />1.0 d. Report Writing Date: 06/16/2004 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR,...Citizen Complaint Referral (non site visit) <br />p~_._Oversight RFx.... Reclamation Fees CO...... Citizen Complaint (Initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defned in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />permitted but not yet disturbed. AB7.. Bond Foreiture: Bond forfeiture offcially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. Qnterim Program Permit) -AB2..Partially Reclaimed Forfeiture: Fortened site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR.., good Release: Reclamation completed and State Regulatory A63.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes- Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have keen started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted pertormance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 GFR 816/ lion of forfeited site is in progress. <br />have not begun. 817.131 (b). FR.. Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining P1...Phase I RRelease: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is Permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release y~/C. Wildcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is (or the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surace coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...EZploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 213 <br />C... Preparation Plant G... Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Aericulture Re~u]atory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments fron <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeenc 's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) page I of <br />and wish to comment en the enforcement or complia¢ce activities of OSM, call 1-888-REG-FAIR (1-R88-734-3247), xcvs,~anecv„en a. rv9e <br />v <br />