Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br /> <br />BULLDOZER WORK <br />~d <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG ' <br />Task # : 001 Stale ~ Colorado PermiVjob# : M-198J-159 <br />Dale: 0f/J02001 County: MOnlrose gbhrevialion none <br />User WHE Sile: Gleason Pit Filename:Mf59-001 <br />Permit or other lob action :Routine 1 fOc bond review <br />Task description Highwall reduction lrom 0.9H:1V to 3H:1V slope <br />HOURLY EQUIPMENT COST Basic machine :Cat D6N (1996) Horsepower 285 <br />Blade type ~ Soml-Universal <br />Attachment no. 1 : ROPS Cab Shdt basis 7 per day <br />Attachment no. 2 ~ 7-shank upper <br /> <br /> Utilization b Cost data source : (CRG) <br />Cost Breakdown; Ownership cosUhour : E44.00 NA <br />Operating cosUhour : E64.40 700 <br />Ripper op. cost/hcur : 50.00 0 <br />Operator cosUhcur : E27.99 NA <br />Total unit cosOhour: E/36.38 Total Oeel cost hour: $1J6.38 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 3,769 LCY lector: NA volume: J,769 LCY <br />Source of quantity lake-o6 : See attached tlmwtng, -Highwall Retluclion 7' <br />Source of est. swell lector : NA <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Average push distance : 50 feet Source <br />Unadjusted hourly production : 7180 LCYIhr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 10.00 % (neg) <br />Average site altitude : 6,560 feet <br />Material weight : 2,650 IbsrLCY <br />Maleriaf weight description : <br />Decomposed mck-25%Rpck, i5%Eanh <br />Operator skill : 0.75 <br />Material consislenry : 0.90 <br />Doling method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient' 1.22 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Nel correction : 0.48 <br />Adjusted unit production . 562.07 <br />Adlusletl gees production : 562.07 <br />LCY/hr <br />LCYIhr <br />JOB TIME AND COST <br />Fleet size : 7 Dozers) Total lob lime : 6.71 Hours <br />Unit cost 50.24) /LCY Total lob cost : $915 <br />