My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC11232
DRMS
>
Back File Migration
>
Inspection
>
INSPEC11232
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:13:14 PM
Creation date
11/18/2007 8:50:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983159
IBM Index Class Name
Inspection
Doc Date
2/2/2001
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• CIRCE: III IIIIIIIIIIIII III mare • <br />C G _ . 999 <br />........ <br />PROJECT IDENTIFICATION <br />Date . _ 30-Jan-2001 <br />User WHE <br />Filename: M759-000 County <br />Agency or organization name .CMG <br />Permlt or job action ,Routine 110c bond review <br />Permit or job no.: ~ Site <br />Abbreviation : none Sta~ <br />i <br />TASK LIST (DIRECT COSTSI <br />NO TASK DESCRIPTION ~ FORM <br />USED FLEET <br />SIZE TASK 9bIRECT <br />HOURS COST <br /> <br />001 I-High wall reduction from 0.5H:1 / to 3H:1 V s/ope <br />-- dozer 1 6.71 $915 <br /> I I <br />002 -High wall reduction from 2H.' 1 V ;0 3H:1 V slope dozer 1 0.94 $129 <br /> <br />00 R3 1I !p 8 rough grade 6 5 acres af,`ecled area dozer 7 30.8 ~ $4,267 <br />i <br />004 -Replace topsoil 3" - 6"depth over 8 acres affected area scraper2 ' 1 9 6 $2,174 <br /> <br />005 -Revegefate 8 acres affected area revege 1 8.0 $6,239 <br /> <br />006 -Haul reclamation equipment to and from lob site mobilize 4 3.49 $1,545 <br /> <br />007 -Remove mist debris, assume 20'L '10'W '10'H @ $0.22/cf NA 1 6.0 $440 <br /> <br /> <br /> <br /> .1 K-Y-: . •.r o r <br /> <br /> <br /> k•. .. <br />+ <br />I f r7 i <br />~ ' - <br /> <br /> <br /> <br />SUBTOTALS 65.691 $15,709 <br />' includes inllalion factor adjusimenl of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />NA <br />Liability insurance : 1.55 % of direct total = $243 <br />Performance bond . 1.05 % o/ direct total = $765 <br />Job superintendent ~ NA' NA NA total = NA <br />Profit: 10.00 %ofdirect total= $1,571 <br />TOTAL DIRECT COST' _ $1$, 709 <br />'not mgwred (or eqp operator serres as super) <br />PROJECT MANAGEMENT - <br />Engineering work and/or contiacUbid preparation <br />Reclamation management and/or administration <br />CONTINGENCY . <br />' conrmgencies accountetl !or aI Iask IeVe~ <br />TOTAL08P= $1,979 <br />CONTRACT AMOUNT (direct ~ o a P) _ $17, 688 <br />NA NA NA total = NA <br />5.00 % of Intr. NA total = $884 <br />NA' NA total = NA <br />TOTAL INDIRECT COST= $2,864 <br />TOTAL BOND AMOUNT (direct + indirect) = 818,573 <br />
The URL can be used to link to this page
Your browser does not support the video tag.