Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID #: A~-aa77-95r <br />INSPECTION DATE: -Cl~}^hP~ ~'~ ~~7 INSPECTOR=$ INITIALS: ~B2.. <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />conective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION DATE <br />1. The Financial Warranty is not at a level which reflects the actual current cost to reclaim this I / ~ p / pg <br />site to the requirements of the approved reclamation plan as required by Rule 4.2.1(1). <br />PB or PV: ~B_ <br />TOPIC(S): ~_ <br />C'C)RRFCTIVF ArTIr~M <br />Gi ihmif n(i(iifinnnl tinr~nCl^I wnrrnn4y in the CLni int ^f ~39 9g9 hK,januaLy ill, 7Q08 Tha <br />nPw finnncinl wt'~rrtynty f^r Chic city will hP 79.739 <br />2. / / <br />PB or PV: _ <br />TOPIC(S): <br />3. / / <br />PB or PV: <br />TOPIC(S): <br />