My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC10978
DRMS
>
Back File Migration
>
Inspection
>
INSPEC10978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:12:53 PM
Creation date
11/18/2007 8:49:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Name
COAL INSPECTION REPORT
Inspection Date
3/21/1995
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments inGude discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />On March 21 through 24, a complete inspection was conducted at the New Elk <br />Mine. Conditions were generally clear and very windy with a cooling trend toward <br />the end of the week. March has been a dry month and the ground was dry. <br />RDA <br />The upper area diversion was walked around the RDA. This new diversion <br />replaces a lower diversion as the waste pile is build up. Slopes on the outface are <br />at a 2:1. and benched in 50 feet levels. The lower slopes were well vegetated <br />except for the benches where vehicles have driven on the vegetation. <br />Piezometers have been installed on the benches to monitor water levels for pile <br />stability. The conveyor was walked and no concerns were noted. The diversion <br />showed no indication of carrying water. This ditch was Gear from fallen rocks. <br />Five of six conveyors were lined up on the west side of the refuse pile. Currently <br />a loader, a truck and a dozer were working the pile. There were a few wet spots <br />noted in the pile. The east rock gabion was walked down to the pond. In some <br />sections the river rock had shifted downhill and bunched up at the end of each <br />Reno Mattress. Some mattresses appeared to have lost some rock. These <br />sections should be repaired as soon as possible. This probably occurred during <br />the 10 year 24 hour event last year. There were other sections that have rusted <br />wire baskets that may need replacing in the future. A crossing of wood cribbing <br />had been placed across the drainage to allow maintenance equipment to cross <br />without damaging the channel. This should be removed when not used in order <br />to keep the channel at full capacity. General maintenance will be required on <br />both east and west gabions to make sure all sections will work effectively. <br />
The URL can be used to link to this page
Your browser does not support the video tag.