My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC10947
DRMS
>
Back File Migration
>
Inspection
>
INSPEC10947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:12:49 PM
Creation date
11/18/2007 8:48:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Inspection
Doc Date
6/1/2004
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
4/13/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trapper Mine Phase 1 pe. 2 <br />We dug soil replacement depth holes in several randomly selected areas and we took <br />hand held GPS readings at (most of) the soil sample sites. All soil replacement depths <br />observed met or exceeded the permit requirements of 12 inches + / - 2 inches. <br />We observed at least two sharptailed grouse flush at approx. N 40 26 133, W 107 34 4S0 <br />on map block N-B-98-8. <br />We took slope measurements at approx. 7,4SS feet at N 40 25 380, W 107 33 416 at <br />F-A-03. <br />We observed standing water at the upper end of F-AB-99, and contours at this may be <br />suitable for a water impoundment location adjacent to undisturbed mountain shrub <br />habitat. Final reclamation contours on all these areas blended in well with undisturbed <br />areas, and will facilitate the approved post mining land uses. <br />All the proposed release areas on the eastern portion of the permit area were inspected on <br />April 14, with very similar observations as compared to the western permit areas, minor <br />erosion rill only, and topsoil replacement depths meeting or exceeding permit <br />requirements. <br />Area A-B-00 will be inter-seeded with a 400 foot by 100 foot strip. <br />Small erosion gully needing repair was noted in the main drainway of A-B-01. <br />This concluded our field inspection. <br />Please address any questions concerning this inspection report to Henry Austin, <br />Senior Reclamation Specialist, at haustin@osmre.sov or to (303) 844-1400 X1466. <br />
The URL can be used to link to this page
Your browser does not support the video tag.