My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC10888
DRMS
>
Back File Migration
>
Inspection
>
INSPEC10888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:12:38 PM
Creation date
11/18/2007 8:47:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977251
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
5/27/1999
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />(Page 3) <br />MINE ID # OR PROSPECTING ID # M-77-251 <br />INSPECTION DATE 05/27/99 INSPECTOR'S INITIALS CLK <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />Boundary markers have not been set along the western or southern boundary. This July 2, 1999 <br />must be remedied, in accordance with rule 3.1.12(2) of the Construction Materials PB or PV PB <br />Rules and Regulations. CORRECTIVE ACTION: Post stakes or other boundary TOPIC(S) SM <br />markers along the unmarked boundaries, and send proof of same (photos) to DMG <br />within 30 days. <br />2. The stotmwater damage is eroding the east face of the site, undermining the slope. July 2, 1999 <br />Further damage must be prevented, in accordance with rule 3.1.6(3) of the PB or PV PB <br />Construction Materials Rules and Regulations. CORRECTIVE ACTION: Grade TOPIC(S) SC <br />the slope so that water drains either back into the pit, or into the already <br />established drainage south of the eroded area. <br />3. <br />PB or PV <br />TOPIC(S) <br />
The URL can be used to link to this page
Your browser does not support the video tag.