Inspection
Doc Date
10/3/2000
Doc Name
COAL INSPECTION REPORT
Inspection Date
9/28/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required <br />abatement and date of abatement for the violation, previous violations still requiring <br />abatement and the termination of violations cited during previous inspections. <br />Notice of Violation CV-2000-007 was issued for "failure to complete construction of <br />sediment pond Ol b prior to disturbance of the undisturbed area that drains into the <br />pond". This NOV applies to the area where topsoil was salvaged from the hillside in <br />the northern part of the Pond O16 drainage basin. Abatement requires SCC to <br />complete the construction of the pond and to certify construction by a registered <br />professional engineer no later than October 31, 2000. If additional time is needed, <br />an extension can be requested. <br />The NOV was sent separately by certified mail. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />Revised 2197 <br />m:\coal\snare\farrns\8101 <br />