Laserfiche WebLink
III. CONIIYSENTS - COMPI.rANCE <br />Hebw are comments on the inepcetla~n. The comment inch~de dlecvsakn oY obaervatlons made dun'ng the 6uPectlon <br />Commeats also de9c~e any mforcwad acdoos taken dtshig the ospection and me Sets or evldwce suppo~UOg the <br />aforcemmt actloa <br />The operator stated that culvert C-B6 had been blocked by ice or by crashing. It had been noticed <br />when the operator had flushed out a fire hydrant. If nmoffin the culvert backs up, the overIlow <br />will get into ditch D-C7 and flow into pond C. The drainage area for culvert C-B6 is very small. <br />The operator plans to deal with the culvert in the near future. <br />The operator decided to install a culvert from the gob pile topsoil stockpile area to pond D, rather <br />than rely solely on an SAE demonstration. This culvert will need to be shown on a map along with <br />a hydrology design. The operator still needs to put a grate over the drop structure at the inlet to <br />culvert C-B16. <br />There were no other problems with culverts and ditches, although not much could be seen due to <br />the snow cover. <br />'the operator has started a new topsoil stockpile just to the west of the covertlll stockpile. The <br />topsoil stockpile just to the west of pond C has been moved to the gob pile topsoil stockpile. <br />These two changes will need to be shown on an appropriate map. All of the topsoil stockpiles <br />were covered in snow. Appropriate sediment control measures were in place. <br />No explosives are currently on site. No problems were observed at the powder and cap houses. <br />The operator stated that the mains have been driven in about 1000 feet. Coal was being stockpiled <br />on the portal bench. The escape tunnel at the coal stacker tube location was being reworked. The <br />shop building was nearing completion. Work was continuing on the crosherlscreener structure. <br />Two fuel tanks on the southeast part of the portal bench were empty. The operator is using the fuel <br />tank farm exclusively. Construction is finished at the water tank bench above the portal bench. The <br />operator only needs to add riprap to the culvert outlets that are associated with that bench. The <br />pumphouse and substation installations aze complete. The operator needs to install new hay bales <br />at those two locations. <br />~~/ <br />