Laserfiche WebLink
<br />ROADABLE EwUIPMENT: <br />Machine Description <br />Total Eqp. <br />Cost/hr <br /> <br />sheet 2 of 2 <br />Fleet Size Haul Trip R turn Trip <br />(no. hauled) Cost/hr Cost/hr <br />=====vv=v=e.s°======.cvv=======o==========cccc==_ o=°°c=====°________°_________~_____________~____~____ <br />Subtotals (0.00 (0.00 <br />MOB/DEMOB SUPPORT EOUIPNENT: <br />--------------------------- Neight Ownership Xaul Rig Fleet Size Haul Trip R turn Trip DOT Permit <br />Nan-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />Subtotals E0.00 f0.00 (0.00 <br />Total Eqp. Fleet Size Haul Trip R urn Trip <br />Roadable_Egp= Description_____ _________ _Cost/hr_=____---- -_---(no. hauled)-- Cost/hr------- ost/hr-- <br />Subtotals f0.00 i 50.00 <br />EWIPMENT XAUL DISTANCE 8 TIME <br />______________________________ <br />______________________________ <br />Nearest mej or City or town <br />within project area region: Pueblo <br />Total one way travel distance = 70.0 miles. Average travel speed = 30.00 mph. <br />Job Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= N/A hours oad <br /> 0.33 hours haul 0.33 hours aul <br /> 0.50 hours unload N/A hours Loed <br /> 0.33 hours return 0.33 hours eturn <br />JOB COST Total Mob/Demob Cost = (762.82 <br />_________ '___________= i <br />NOTE: Non-roadeble equipment (haul rig required to transport) mob/demob costs based on 2 rou trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rip required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equi nt on certain <br />specified road segments within the State. Sege rate permits ere required for each rip o each loaded trip. <br />Addi ti onelly, pilot cars (one or two per rig depending on degree of oversize) are also equired for oversize <br />equipment hauling, and loading/unloading times must be increased substenti ally for equi nt which oust be <br />partially dismantled for transport end re-assembled at the job site. Costs far lifting equipment end other <br />support equi Anent needed for this work should be included in the mob/demob costs. <br />