Laserfiche WebLink
<br /> <br />Colorado Division of Ninerals and Geology ~ sheet 1 of 2 <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DENOBILI2ATION <br />Task M... 5 Prep. by JD Filename..M759-5 <br />Date..... 30-Mar-95 Permit tY M-86-759 Mine......LOrtner tY2 <br />Permit Action........ Phased Reclamation <br />Task Description..... Mob/demob Equipment <br />_____________________________________________~_______________________t_________-____~______ <br />NOURLY EW IPNENT COST <br />____________ ________ NOTE - This is a list to select tram, not a list of mandatory ~tems to include. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GW, 375 HP, diesel powered <br />-Lt. Trailer 25 ton folding gooseneck, drop deck '~ <br />-Med. Trailer 50 ton folding gooseneck, drop deck <br />-HVy. Trailer 720 Ton folding gooseneck, drop deck <br />-Pilot Ler On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, geso the powered <br />-Xyd. Crane Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 12 hp, 60 ft. boom <br />-Fuel Truck :6x4, 3,600 gallon capacity, 210 HP, diesel powered i <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20,000 lb GW, 175 XP, diesel powered <br />Las[ Updete: -"------- -'--'-"'-- ------------ ------'-__----- --___------- ---~-'_'_---"- -------°-- <br />May, 1997 i <br />--------------- Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />--------°------------------------------- <br />Ownership Cost/hr = 526.78 f29. 76 -------------------------------------- <br />537.74 5139 f19.89 ------------ <br />56.02 -- ---------- <br />510.66 ----------- <br />56.70 <br />Operating Cost/hr = 523.23 524.76 529.92 54.05 523.40 E16.19 f20.71 57.47 <br />Operator Costlhr = 520.54 520.54 520.54 519.81 520.86 (19.97 519.97 519.97 <br />Helper Cost/hr = 219.81 519.87 579.81 f0.00 50.00 50.00 ~ 50.00 f0.00 <br />Total = 59036 594.27 5108.01 525.25 f64. 15 542.18 S51 34 534.74 <br />NON-ROADABLE EOUI PNEN T: <br />--------------------- - Nei ght Ownership Heul Rig Fleet Size Haul Trip R urn Trip DOT Permit <br />Machine Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr ost/hr Cost/ea <br />Cet D7H 30.20 535.27 f94.27 1 5129.54 594.27 <br />Seeding Equipment 70.00 520.00 59036 1 577036 (9036 <br />Subtotals 5239.90 15184.63 50.00 <br />