Laserfiche WebLink
Colorado .Department of Health <br />[9a ter Quality Control Division <br />Page 7'wo <br />Scheduling for completion of the projects has hinged on the <br />drying out of Pond #2 for sludge removal. Trucks should begin <br />hauling sludge to the mill disposal site the week of August 13, <br />1990. Pond #2 cleaning and sealing will take 2-4 weeks. Flume <br />and bypass line installation will take 2 more weeks. Very rainy <br />weather could create problems which may cause delays, however the <br />entire project should be completed by September 28, 1990. <br />At this time SJCMV requests approval for the change in the <br />location for the Terry Tunnel pischarge point (TT002). The <br />monitoring site will be moved approximately 100 feet up Dill from <br />the present location. Effluent will flow from the flum~a into a <br />concrete manhole from which it will flow into 24" CMP to Eureka <br />Creek. The move will provide better access, flow measur~ament and <br />maintenance and eliminate future deficiencies in flow measuring <br />device. <br />Please feel free to call if you have comments or questions. <br />Sincerely, <br />Ed/taj <br />Enclosures <br />cc: Larry Perino SJCMV <br />Sandy Marek, CDH <br />Leslie Simpson, CDH <br />EPA, Region VIII <br />~~`=~ District Office <br />EJelyn ngham <br />Mine Engineer <br />r.-* <br />