Laserfiche WebLink
<br />MINE ID # OR PROSPECTING ID ~k M-83-090 <br />INSPECTION DATE 05/14/99 <br />INSPECTOR'S INITIALS ESC <br />The operator will need to fit= an amendmenC to the permit to change the final reclaimed land <br />use to include "Developed Water Resource." The amendment should include a map showing the <br />location of the slurry wall and engineered designs showing the design details, including <br />information on the underlying bedrock. The operator will also need to submit a certified <br />construction report detailing the as-built" condition of the slurry wall. In addition, the <br />operator will need to provide sign-off from the Office of the State Engineer (OSE) or provide <br />sufficient amount of reclamation bond. If the OSE signs off on the slurry wall, the need for <br />drawings, as-built certifications or additional bond will not be required. <br />The Division noted Leafy Spurge within the disturbed area of the site. The operator will <br />need to include a weed-management plan to control the spread of noxious weeds. The weed <br />management plan should be sut~mitted concurrently with the permit amendment. The Division <br />recommends that you consult with the County weed control specialist. <br />In summary, the following items will need to be submitted to the Division as a result of the <br />complaint letter from Sinclai~.r Pipeline Company and the Division's observations; <br />• File a technical revision to include a detailed plan to ensure the pipeline corridor is <br />protected from slides or damage as a result of the mining or reclamation activities. In <br />particular, Hall-Irwin will need to submit a plan to safely pass surface water runoff <br />between Pits #~S'~and #~ ~ 'T'his can be included in the amendment application noted below, <br />or as a separate technical. revision. <br />• File an amendment to the :oermit to change the final reclaimed land use to •` Developed <br />water Resource." The ame~idment should include a map showing the location of the slurry <br />wall and a certified construction report detailing the as-built" condition of the <br />slurry wall, engineering designs and additional bond or a sign-off from the OSE. <br />• Include a weed management plan to control the Leafy Spurge noted on site in either <br />revision noted above. <br />See page 4 of this inspection report for compliance due dates. <br />I & E Contact Address <br /> ^ CE <br />NAME Jeff Gregg _ ^ BL <br />OPERATOR Hall-Irwin Construction Company ^ FS <br />STREET P.O. Box 519 ^ HW <br />CITY/STATE/ZIP Greeley, Colorado 80632 ^ HMWNID (CH) <br />CERTIFIED MAIL NO.Z- - L~ q <br />~~ ca' <br />5~~ ^ SE <br />wQCD (cH) <br />RETURN RECEIPT REQUESTED <br />CC: Don K. Neuwerth <br />Sinclair Pipeline Co. <br />P.O. flox 185_ <br />Sinclair, Wvominq 82334 <br />(Page 3) <br />CarlMOUnt;DMG <br />