My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC10308
DRMS
>
Back File Migration
>
Inspection
>
INSPEC10308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:11:53 PM
Creation date
11/18/2007 8:45:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Inspection
Doc Name
OSM MINE SITE EVALUATION INSPECTION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
available for review. <br />Discharges: The mine does not~make water so shower water and equipment <br />needs are provided by their well. There was no mine water discharge. <br />Protected Stream channels: There are none. <br />HAUL/ACCESS ROADS <br />Surfacing/maintenance/ditches and culverts and reclamation: Roads are <br />limited to the immediate surface distuubance of the mine. No problems <br />were noted. All ditches were being maintained. The culverts under the <br />access road to the county road were clear and functioning. <br />TOPSOIL <br />There is no active removal in process, placement is in a secure area <br />that is maintained and provides protection as required. <br />BACKFILLING AND GRADING <br />None in process. There are plans to change the waste rock disposal area <br />which includes some reconfiguration of the surface of the disturbed area <br />but the only disturbance outside of that is slated for the relocation of <br />one of the perimeter undisturbed area ditches. This will be addressed <br />as it occurs. <br />REVEGETATION <br />None in process. <br />COAL MINE WASTE <br />Waste rock is temporarily stored on an approved part of the surface <br />disturbance. The operator is changing that area to a permanent disposal <br />site as of the recent mine plan revision that eliminates the single <br />spillway violation. The outslopes of the disposal area are to be <br />extended for reclamation purposes per the state inspector. The current <br />location of the mouth of the eastern perimeter undisturbed area <br />diversion is to be covered with waste rock in the new proposal. That <br />portion of the diversion will be moved upslope. In addition, part of <br />the coal storage pad will be altered but it is not clear as to how that <br />will be constructed without further review of the plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.