Laserfiche WebLink
(Page 4) <br />MINE ID # OR PROSPECTING ID # M-1999-025 <br />INSPECTION DATE 3/3012005 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PB) andlor possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />/1 Tamarisk are invading affected areas of the site along dewatering ditches and in the wash Ip ant <br />..,.wr..,. nn.,a 04 / 29 / 2005 <br />PB or PV: PB <br />TOPIC(S): PW <br />Please indicate what measures will be taken to manage tamarisk and Russian olive and submit a <br />technical revision to incorporate these measures into the permit. <br />~2. The operation is not in romnlianre with the mining plan in terms of has . c -quPnr.P, Noxious weed <br />management plans. and permitting of an inlet structure prior to excavating Phase V_ 05 / 27 / 2005 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): MP <br />Submit a revision to the permit that addresses. engineering designs and bonding for installation of an ~ <br />inlet thatwill safelypass the 10~ear event or documentation from the U. S. Fish and Wildlife Service <br />and Army Corps of Engineers indicating that the outlet can serve as both an inlet and outlet for the pit <br />lake. a new phased mining sequence that is consistent with current excavation and future mining <br />plans. and updated specifics regarding wetlands in the permit area. <br />J3. Mined out phases are not being reclaimed within 18 months as specified in the reclamation plan <br />Meanwhile mining progresses, resulting in a higher reclamation liability than the state hold bond for. 05 / 27 / 2005 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): BG <br />Either perform adequate reclamation to bring the sequential reclamation in compliance with the F11 B~ - <br />reclamation plan or submit a revision to incorporate the new north perimeter road into the permit <br />allow for increased reclamation liability, and specify an increased financial warranty to cover that <br />liability (as verified by OMG through the technical revision process). <br />1, Steve Shuey, hereby certify that on April 5, 2005, f deposited a true and complete copy of this foregoing inspection <br />report in the United States Mail, first class postage paid, to the operator of record for this site at the address indicated, <br />and to those others within the body of this report who have been designated to receive copies (DMG personnel <br />excepted). <br />Signature <br />