Laserfiche WebLink
• • (Page 3) • <br /> MINE ID f OR PROSPECTING ID f M-84-036 <br /> INSPECTION DATE 09/12/96 INSPECTOR'S INITIALS CLK <br /> The following problems (PB) and/or possible v ations (PV) (and suggested corrective <br /> actions) were identified during this ', ction The problems should be corrected by the <br /> dates given, or they will become possible violations. The possible violations should be <br /> corrected by the dates given to reduce their severity when considered by the Mined Land <br /> Reclamation Board. The inspector noted on the previous page should be notified of all <br /> corrective actions taken. <br /> PROBLEMS/POSSIBLE VIOLATIONS <br /> AND <br /> CORRECT5F ACTIONS <br /> CORRECTION <br /> DATE <br /> 1. DMG requires that the Operator submit proof of topsoil Nov. 18, 1996 <br /> covering the process area by submitting a current PB or PV PB <br /> topsoil sample analysis taken from the area in TOPICS) TS <br /> question, so that DMG may evaluate the need for further <br /> material at the site and adequately calculate the <br /> currently required bond; or submit proof of other <br /> topsoil stockpiles at the site. This is in accordance <br /> with Rule 3.1.9(6) and 4.2.1(1) of the Construction <br /> Materials Rules and Regulations. <br /> 2. <br /> PB or PV <br /> TOPIC(S) <br /> 3. <br /> PB or PV <br /> TOPICS) <br />