Laserfiche WebLink
~. <br />Blue Ribbon Coal Co. Page 2 <br />Development rock from the New Elk Mine (Arco) is going to be used as <br />fill material for some of the face up. Mr. Reschke said that con- <br />tractors would begin hauling from the North Fork Mine location on the <br />Monday following this inspection. Initially, it was to be hauled and <br />dumped in place in the final fill configuration but since the total <br />project was set back due to the unexpected slide, the development rock <br />is to be temporarily stored in the coal stockpile area. <br />I asked Mr. Reschke if OSM had approved the bench overhaul. He said <br />that the State was the lead agency so if OSM's approval was necessary <br />they would forward the modification to the Technical Center. I called <br />Rick Holbrock, Colorado team leader, OSM, WTC, about the modification. <br />He said that the modification was waived for approval because it was <br />designated as a minor modification by the Technical Center. <br />