Laserfiche WebLink
.. :~ „ - ,~ <br />k <br />~~ . <br />' INSPECTION REPORT - PAGE 3 <br />FILE N0. M-85-022 <br />DATE: August 22, 1986 <br />RECOMMENDATIONS: <br />1.) The existing financial warranty is insufficient to allow the <br />reclaim the current disturbance. Submit specific and occur <br />calculations that show the amount of disturbed area. These <br />must be accompanied by accurate site maps (see item No. 2). <br />State to <br />to acreage <br />calculations <br />2.) Submit a technical revision that clearly outlines the curre t site <br />configuration. Ponds have been built that are not permitte The <br />technical revision maps must meet all requirements of the Minerals Rules <br />and Regulations. They must show all ponds, relief, work ar as, etc. <br />3.) The permit boundary should be clearly marked with rods and <br />flagging or some other reasonably permanent markers. <br />4.) Some of the ponds are seeping and some evidence possible s <br />Provide an engineers certification of all pond structures. <br />5.) Some ponds have been breeched during previous operations. <br />from these ponds constitutes a violation to your permit. <br />discharge during future operation. <br />6.) Store all chemicals and petroleum products away from pond <br />7.) Tree slash should be cut and removed. Use for firewood is <br />8.) Site personnel should be familiar with all permit requi <br />9,} Complete all corrective ac ti an no later than October 15, 198 <br />consideration of possible violations. A financial warranty <br />adjustment/increase will be considered at the October '23-24, <br />meeting of the Mined Land Reclamation Board. <br />ss cracks. <br />scharge <br />ds must not <br />p water. <br />commended. <br />s. <br />to avoid <br />1986 <br />/bdc <br />Doc. No. 3481E <br />