Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 007 <br />Date : 10/06/2005 <br />User : WHE <br />County :San Juan <br />Site : Sunnyside Mine <br />Agency or organization name :OMG <br />Permit or other job action : SR-04 <br />Task description :Finish <br />HOURLY EQUIPMENT COST <br />Pond 4, sludge cell <br />Basic machine :Cat D5G LGP - 5P <br />Blade type :Power Angle Tilt <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Horsepower: 90 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $13.34 Nq <br /> Operating cosUhour : $21.02 100 <br /> Ripper op. cost/hour : $0.51 25 <br /> Operator cosUhour : $31.78 Nq <br /> Total unit cost/hour : $66.66 Total fleet cost/hour : $66.66 <br />MATERIAL QUANTITIES - ~ ~ -- <br />Initial Swell Loose <br />volume : 9,680 LCY factor : NA volume : 9,680 LCY <br /> <br />Source of estimated volume : (3ac)(43560sf/ac)(2'D) / 27 = 9680 cy <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 306.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shiff/day) <br />Consolidated stockpile Spoil pile : 0.80 (ind-rf) <br /> <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat H$) <br />Average site altitude : 10,000 feet Material weight : 0.87 (Cat H8) <br /> Blade type : 1.00 (PAT) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.43 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 132.60 LCY/hr <br /> Adjusted fleet production : 132.60 LCY/hr <br />. .. .................... ................ <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.503 /LCY <br />State :Colorado <br />PermifCob# : M-1977-378 <br />Abbreviation :none <br />Filename : M378-007 <br />Total job time : 73.00 Hours <br />Total job cost : $4, 868 <br />