Laserfiche WebLink
ROADABLE~EQUIPMENT sheet2~of2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />Cost/hr/fleet <br /> <br />-Flatbed Truck, 4x2, 15K GVW $41.38 1 $41.38 $41.38 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $41.38 ~ $41.38 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 1.62 1.62 Total non-roadable mob/demob cost' <br />Return time (hours) = 1.62 1.62 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost" <br />Unloading time (hOUr$) = 0.50 NA "one round trip, no haul rig <br />Subtotals = 4.25 3.25 <br />Montrose <br />65.0 miles <br />40.0 mph <br />$2, 293.29 <br />$134.48 <br />JOB TIME AND COST Total job time : 8.50 hours <br />Total job cost : $2,428 <br />