Laserfiche WebLink
intercepted by the pond. Also, the natural gully should be watched to make sure water <br />is not funneled off the reclaim to cause accelerated erosion. If this is the case a <br />contour fun'ow should be placed above to intercept the flow and cant' it across the <br />reclaim. <br />The drainage to pond under the access road has had some recent work to clean the <br />outlets of the 2 - 24" culverts. These outlets had been submerged due to water <br />backing up in the ditch below the outlet. The ditch had been cleaned but the grade of <br />the ditch below the outlets should be checked to make sure water doesn't backup <br />again. <br />Comments Page 3 <br />