Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 02Ju1-2001 Permit or job no. ~. M-198)-028 <br />User ~ SSS Abbreviation ~ none <br />Filename: M028-000 <br />Agency or organization name : DMG <br />Permit or job action :Routine reclamation cost estimate upda <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />01 a -Backrll west highwall to a 4:1 slope dozer 1 5.7 $822 <br />02a -Back(ill east highwall to 2:1 slope dozer 1 3.7 $541 <br />03a -Rip and level pit floor and stockpf/e areas dozer 1 30.3 $4,483 <br />04a -Replace topsoil on affecetd area dozer 1 52.7 $7, 569 <br />05a -Revegetate distrubed areas o(the site revege 2 24.0 $5,554 <br />06a -Transport reclamation equipment toffrom site mobilize 3 4.0 $1,527 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 120.5 $20,496 <br />'includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />NA <br />Liability insurance <br />Pertormance bond <br />Job superintendent <br />Profit <br />' not nx)uiretl (or eqp. operator serves as super.) <br />PROJECT MANAGEMEN7- <br />Engineering work and/or contracUbid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />'contingencies accounletl for aI task level <br />% TOTAL DIRECTCD$T'= $20,496 <br />1.55 % of direct total = $318 <br />1.05 % o/direct total = $215 <br />NA' NA NA total = NA <br />10.00 %o(direct total= $2,050 <br /> TOTAL O d P = $2, 582 <br /> CONTRACT AMOUNT (direcl+ O 8 P) _ $23, 076 <br />NA NA NA total = NA <br />5.00 % o(cntr. NA total = $1,154 <br />NA' NA total = NA <br /> TOTAL INDIRECT C05T= $3,736 <br />TOTAL BOND AMOUNT (direcl+ indirect) _ $24,232 <br />Site ~. Wallace Pit <br />State :Colorado <br />County :Montezuma <br />