Laserfiche WebLink
<br /> RELATIVE C011PALTION TEST RESULTS <br />PROJECT: Gob pile PROJECT N0: M91003MT DATE : 2/1f91 Friday <br />LOCATION: Sommerset, c0 EIIGIPIEERING TECH NICIAN: A• Woods <br />CLIENT: West Elk Coal Company <br /> DEPTH PROCTOR OPT MUM <br />~ DRY OISTURE P.ELATIVE <br />TEST LOCATION OR DENSITY MUIS <br />URE <br />CONTENT DE"ISITY CONTENT <br />COMPACTION <br />SOIL TYPE <br />N0. ELEVATION PCF x PCF I ,, <br />6 150' from entrance, 50' From Top of lift 79,0 16,5 78,7 10,0 100 Coal gob <br /> north side <br />7 150' from entrance, 30' from 79.0 16.5 85,2 15,6 100 " " <br /> south side <br />8 Center, 50' from south side 79,0 16,5 77,6 14,2 98 " <br />9 Center, 70' from north side 79.0 16,5 76.7 14.0 97 <br />10 75' from west end, 60' from 79,0 16.5 77,8 16,3 98 <br /> north side <br />11 80' from west ehd, 75' from 79.0 16,5 76,7 11,0 97 <br /> south side <br />REMARKS; The test results indicat e the density and moisture content for the location and <br />elevation tested only. <br />RELATIVE COMPACTION TEST RESULTS <br /> ' ~ ~ <br />~ <br />~,~1111~1C1 <br />t t111~1 ,L~ <br />,~ <br />Of1~1tC,L1 <br />