Laserfiche WebLink
- ~ Lambert anD ~s,~DriatPs <br />CONSULTING GEOTECNNICAL ENGINEERS AND MATERIAL TESTING <br />D AI L'1 FIELD REPORT <br />PROJECT NUMBER M91003MT DATE 2/1/91 Friday <br />PROJECT NA,4E Gob Pile _ TECHNICIAN A. Woods <br />PROJECT LOCATION Sommerset, CO <br />CLIENT West Elk Coal Company <br />CONTRACTOR West Elk Coal Company <br />WEATHER CONDITIONS Sunny, windy, colc' <br />WORK REQUESTED Density Tests <br />FOREMAN Ms. Kathy welt <br />WORK PE RFO R:4ED B'1 LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site at 9:00 AM as requested by Ms. Kathy <br />Welt. I performed soil moisture content and soil density tests as <br />requested by Ms. Welt of material being placed in the gob pile using <br />nuclear soil density test methods. Please refer to the test results <br />sheet for approximate test locations and test results. The test results <br />were verbally given to Ms. Kathy welt of West Elk Coal at the time of our <br />site visit. The test locations were determined by Ms. Welt. The test <br />results indicate only the relative compaction and soil moisture content <br />of the material tested at the elevation and location tested at the <br />time of our site visit. <br />P.O. BOX 3966 P.O. 60X OOaS a63 TURNER. t 0a A <br />GRANO JUNCTION. CO 61502 MONTROSE. CO 81 a02 DURANGD. CO 81301 <br />(303) 2a5~6506 (303) 2a9.2t5a (303) 259.5095 <br />