My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC08351
DRMS
>
Back File Migration
>
Inspection
>
INSPEC08351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:08:34 PM
Creation date
11/18/2007 8:35:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998019
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Grand Gravel
Inspection Date
9/26/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) <br />MINE ID # OR PROSPECTING ID #: M-1998-079 <br />INSPECTION DATE: 9/76/02 <br />INSPECTOR'S INITIALS: KAP <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible violations <br />should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Board. The <br />inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />i. During the inspection, it was discovered that no protective berm or liner was installed <br />around and under the above around fuel storage tank located on the permit area. This puts the <br />hvdrologic balance at the site. as described in 3.1.6 and 3.1.7 of the Construction Materials Rules and <br />Regulations, at risk <br />installations to DMG within 60 davs of receipt of this inspection report. <br />2. During the inspection, it was discovered that fuel had been spilled on the ground near the above <br />ground storage tank. This puts the hydrologic balance at the site, as described in 3.1.6 and 3.1.7 of <br />the Construction Materials Rules and Regulations, at risk <br />corrective Action: Remove the contaminated soil or dig_up and periodically turned over the contaminated <br />CORRECTION <br />DATE <br />12/ 7/02 <br />PB or PV: ~~ <br />TOPIC(S): ~L <br />12/ 7/02 <br />PB or PV: ~/~ <br />TOPIC(S): FIR <br />photos of the abated area to DMG within 60 davs of receipt of this inspection report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.