Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />WESTERN FUELS - Number C-81-008 FlDate <br />Codes: <br />A. Ad <br />28. Perform <br />3=Not Planned, 4=Not <br />L _ Mining within Valid Permit <br />2. _ Mining within Bonded Atea <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance <br />1._ Drainage Control <br />2._ Inspections & Certifications <br />3._ Siltation Swctures <br />4._ Discharge Swctures <br />S._ Diversions <br />6._ Effluent Limits <br />7._ Ground Water Monitoring <br />8._ Surface Water Monitoring <br />9._ Drainage -- Acid-Toxic Materials <br />10._ Impoundments <br />11._ Stream Buffer Zones <br />Topsoil & Subsoil <br />1. 1 Removal <br />2. 1 Substitute Materials <br />3. 1 Storage and Protection <br />B. <br />C. <br />Cited <br />D. Backfil6ng & Grading H. <br />Subsidence Control Plan <br />1. _ Exposed Openings _ <br />I. Roads <br />2. _ Contemporaneous Reclamation l. <br />Road Conswction <br />3, _ Approximate Original Contour _ <br />2. Certification <br />4. Highwall Elimination 3._ Drainage <br />5. _ Steep Slopes (includes downslope) 4. Surfacing and Maintenance <br />6. _ Handling of Acid & Toxic Materials 5. <br />Reclamation <br />7. _ Stabilization (rills and gullies) _ <br />J- Signs & Markers <br />E. Excess Spoil Disposal 1. <br />Signs <br />1. _ Placement _ <br />2. <br />Mazkers <br />2. _ Drainage Control _ <br />K. Distance Prohibitions <br />3. Surface Stabilization <br />4. _ <br />_ Inspections & Certifications L. Revegetation <br />1. <br />Vegetative Cover <br />F. Coal Mine Waste _ <br />Timing <br />2• <br />(Refuse Pfles/Impoundments) - <br />Postmitting Land Use <br />M. <br />1. _ Drainage Control _ <br />2. Surface Stabilization N. Outer <br />3. Placement General <br />4. Inspections and Certifications Performance <br />5. _ Impounding Swctures Catagory <br />G. Use Of Explosives 1} <br />1. _ Blaster Certification _ <br />2. _ Distance Prohibitions 2) <br />3. _ Blast Survey/Schedule - _ <br />4. 1 Warnings & Records 3) <br />5. _ Conuol of Adverse Effects _ <br /> Performance Standard Catagories <br /> 30 CFR Cotmterpart <br />A. Administrative ......................................................................... <br />1. Valid Pemut ......................................................................... ............773.11 <br />2. Mining within Bonded Area ...................................... ..........773.11 <br />3. Terms & Conditions of Permit ................................... ..........773.17 <br />4. Liability Insurance ..................................................... ...........800.60 <br />5. Ownership and Control .............................................. ..........778.13 <br />6. Temporary Cessation ..............................842.11(e) & 816/817.131 <br />7. AML Rea Fees -- Non-Respondant .......................... .....870.15(b) <br />8. AML Rec. Fees --Failure to Pay ............................... ......870.15(a) <br />State Program <br />Visit 07/12/1999 Continuation Page <br />E. Excess Spoil Disposal ...........................................(816/817.71-74j <br />I. Placement ............................................................... ............................71(e) <br />2. Drainage Control ................................................... .............................71(f) <br />3. SurfaceStabtltza[ion .............................................. .............................71(8) <br />4. Inspections & Cxrtifications ................................... ............................71(h} I <br />F. Coal Mine Waste (Refuse Pilesllmpoundments) ,,,--(816/817.81-84) <br />1. Drainage Control ................................................... ............................83(a) <br />2. Surface S[abiliza[ion .............................................. b <br />............................83 <br /> <br />3. <br />Placemen[ ............................................................... ( <br />) <br />............................83 c <br />4. Inspections and Certifications ................................ ...........................83(d) <br />S Impounding Structures 84 <br />B. Hydrologic Balance ......................................(816/817.41-57) <br />G. Use of Explosives ..................................................(816817.61.68) <br />1. Drainage Control ............................................ .............................45 <br />2. Inspections & Certifications .......................... ...................49(a)(10) <br />3. Siltation Swctures ......................................... .............................46 <br />4. Discharge S[tuctures ..................................... ..............................47 <br />S. Diversions ...................................................... .............................43 <br />6. EfFluen[Limits ............................................... .............................42 <br />7. Ground Water Monitoring ............................. .........................41(c) <br />8. Surface Water Monitoring ............................. .........................41(e) <br />9. Drainage--Acid -Toxic Materials .................. .........................41(t) <br />10. [mpoundments ............................................... .............................49 <br />11. Stream Buffer Zones ...................................... .............................57 <br />C. Topsoil &Subsoil ...............................................(816/817.22) <br />1. Removal ..................................................................................22(a) <br />2. Substitute Materials .................................................................22(c) <br />3. Storage and Protection .............................................................22(c) <br />4. Redistribution ..........................................................................22(d) <br />1. BlasterCenification .................................................... .......................61(c) <br />2. Distance Prohibitions .................................................. .......................61(d) I <br />3. Blast Survey/Schedule ................................................ .......................62-64 ' <br />4. Warnings & Records .................................................. ....................66 & 68 <br />5. Control of Adverse Effects ......................................... _..........................67 <br />H. Subsidence Control Plan .................................. .......(817.121-122) <br />I. Roads ................................................................. (816817.150-151) <br />1. Road Construction ...................................................... .....................150(c) <br />2. Certification ................................................................ ......................I51(a) <br />3. Drainage ..................................................................... ..........I50(b)-I5l(d) <br />4. Surfacing and Maintenance ........................................ ..........150(e)-151(d) <br />5. Reclamation ................................................................ ......................150(f) <br />J. Signs & Markers .......................................................(816/817.11) <br />1. Signs ............................... <br />2. Markers ........................... <br /> <br />D. Backfilling & Grading ..............................(816/817.95-107) K. Distance Prohibitions.......................................................(761.11) <br />1. Exposed Openings .:...................816/817.13, l4, I5, & 823.11 & 21 L. Revegeta[ion.........................................-.......,...(816817.111-116) <br />2. <br />3. Contemporaneous Reclamation ......................... <br />Approximate Original Contour .......................... .........................100 <br />................102(a)(l) 1. <br />Vegetative Covet.............. <br />.........................................................1 l I & 116 <br />4. Highwall Elimination ......................................... ................102(a)(2) 2. Timing.............................. ....................................................................113 <br />5. Steep Slopes (includes downslope) ................... .........................107 M. Postmining Land Use ..............................................(816817.133) <br />6. Handling of Acid & Toxic Matetgals ................. .....................102(c) <br /> <br />7. <br />Stabilization (rills and gullies) ........................... <br />.......................95(b) pa e 2 of _ <br />a~maw n~mx, a, ivys g <br />