Laserfiche WebLink
U. S. DEPT. OF THE INTERI0IIII lIIIIIIIIIIIIIII <br />OFFICE OF SURFACE MININIT X99 ~--.._ <br />Mine Site Evaluation ° <br />RECEIVED T~c~ <br />State Program °FSUI:r~~ <br />1. Permittee/Person 9. Permit Nlunbe 9 10. Permit Type <br /> WESTERN FUELS -COLORADO C-81-008 .. PP <br /> 2. Address 11. Field Visit Date 1 1 `os 13. SRA Present <br /> P.O. BOX 628 07/12/1999 O~ ^Y <br />3. Ci 4. State "'r"- ~' <br /> <br />CO 14. <br />Facili e <br />t Stams 15. <br />ite Status 16. <br />Nucla ~ <br />S <br />A <br />5. Zi Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81424 (970)864-2165 <br />140 S <br />7. razor Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev, 22. County Name <br /> O MONTROSE <br />~ <br /> C <br />8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />NEW HORIZON <br />25. Hours 26. Si nature Block 27. Reviewin Official: <br />3.0 a. Permit Review J ll~ `' <br /> <br />3,0 b. Site Visit Time /,,~ S afore: <br />~K" Signatltre: <br /> MPTCH ROLLINGS ID # 370 <br />~ <br />~L <br />X <br /> <br />Travel Time <br />0 c <br />10 Review Date: <br />] / <br />/ <br />14 <br />. <br />. Printed Name: mm - dd - yyyy <br />2,0 d. Report Writing Data: 07/19/1999 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP = Interm Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes ttem 12 CCR.._Ckizen Complaint Referral (non site visit) <br />°~„..Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (indial site visit) <br />Axz.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection - ttem 13 A joint inspection is when a slate inspector accompanies an OSM inspector any time during the review of the mine sde. <br />Pemut Status - fleet 14 AB...,Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the sde without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activdies occurring or 30 CFR 840.11 )) <br />~g <br />Permitted but not yet disturbed. ABt.. good Forteiture <br />Bond forfefture officially in process or completed, and. <br />IN <br />nactive <br />m Permit): Phase II com <br />leted or <br />Perm <br />ne <br />t Pro <br />o <br />d <br />l <br />ti <br />i <br />t <br />t <br />( <br />.... <br />a <br />gra <br />p <br />commence <br />, <br />n <br />rec <br />ama <br />on <br />n progress <br />r no <br />ye <br />Temporary Cessation o/ Operations. (Interim Progrem permit) AB2.. Partially Reclatmed FoAeOure: Forfeded site where ail bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim sde, but sde not reclaimed to Program standards. <br />BR... Bond Release; Reclamation completed and State Regulatory AB3.. Recaimed Forfeiture: Forfeked site that has been reclaimed to Progrem standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Nct Applipble: When sde is unpermitted. <br />Site Status Codes - aem 15 NS.. Non-58e Ysd: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on sde, FP.. Forfeiture Pending The RA is pursuing <br />operations have been started. site regraded and awading phase bond release. actions to revoke the permit, collect the <br />EX.. Coat Exploration: Coal exploration operations TC..Temporery Cessation: The RA has granted pertormance bond(s), and/or reclama- <br />h <br />t <br />ti <br />ti <br />f <br />i <br />i <br />t <br />30 CFR 816/ <br />i <br />f f <br />f <br />d <br />d <br />l <br />it <br />it <br />i <br />n progress. <br />ave s <br />mining opera <br />ons cessa <br />on o <br />m <br />n <br />ng pursuan <br />to <br />on o <br />or <br />e <br />e Is <br />arte <br />and where coa <br />l <br />e <br />s <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />P1 <br />I RR <br />A <br />i <br />Ph <br />l <br />At l <br />t Ph <br />I b <br />d <br />l <br />l <br />ti <br />l <br />t <br />d <br />AP <br />i <br />l <br />d <br />l <br />f <br />ease: <br />eas <br />ve Coa <br />ng <br />... <br />ase <br />e <br />ase <br />on <br />re <br />ease rec <br />ama <br />on comp <br />e <br />. <br />.. <br />ct <br />Pro <br />ucing: Coa <br />su <br />ace min <br />e <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned sde that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is Permitted but there is no bond. <br />facilit(yy such as tipple or preparelion plant: P2.. Phase II Release: At least Phase II bond release WC.Wlldcat: Coal mining and reclamation <br />e and <br />M <br />t <br />it <br />f <br />e <br />ti <br />itt <br />d <br />r <br />ti <br />h <br />v <br />t <br />ki <br />l <br />i <br />Th <br />P <br />it St <br />i <br />t <br />i <br />th <br />N <br />n <br />s ac <br />ive, s <br />e <br />s <br />or <br />e <br />re perm <br />area. ope <br />ons <br />a <br />e or are <br />a <br />ng p <br />ac <br />o <br />ng: <br />e <br />erm <br />a <br />us <br />n <br />e <br />a <br />NM.. <br />not in Temporery Cessation, no suface coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining ac ,and sde not re ratted. the RA has released all bond, wired emits from the RA. <br />Facility Type Codes - ttem 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H... Exploration Permds L... Remising site ppermined <br />A <br />S <br />rt <br />25 <br />5 <br />... <br />u <br />. <br />ace E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR78 <br />8... Underground F... Loading Facility and/or Tipple J.,. Exempt 16 and 2/3 / <br />C... Preparation Plant G... Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Xour Comments Are Important <br />'fhe Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Fedetal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc s <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) Page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, tali 1-888-REG-FAIR (1-888-734-3247). s~~m m«naa, gas <br />