Laserfiche WebLink
Cf ~~ <br />~~9/©~ <br />04 ~o~ COLORADO DIVISION OF MINERALS AND GEOLOGY <br />~~'- <br />h`' 8 MINERALS PROGRAM INSPECTION REPORT <br />" PHONE: (303) 866-3567 <br />~ I89a ~ <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noted below. This report <br />documents observations concerning compliance of the mining operation with the permit and the regulations of the <br />Mined Land Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and suggested <br />corrective actions and/or 3) Possible violations to be considered for pos{{ible enforcement action by the Mined Land <br />Reclamation Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REQUIRE <br />MINE NAME: SOKOL PIT OPERATOR: <br />COUNTY: EL PASO M <br />INSPECTOR(S): BERHAN KEFFE <br />MINE ID # OR PROSPECTING ID #: <br />INSPECTION DATE: <br />INSPECTOR'S INITIALS: <br />INSPECTION TYPE CODE/`i: <br />JOINT INSP. AGENCY CODEt2I: <br />TYPE OF OPERATION: 112C <br />R/26/OS DATE OF COMPLAINT: <br />RK TIME OF DAY (MILITARY): <br />MI POST INSP. CONTACTSt2l: <br />NO REASON FOR INSP. CODEt~I: <br />NO <br />WEATHER CODEt"l: CL BOND CALCULATION TYPEtsI: N <br />OP. REP. PRESENT: TOM SMITH <br />1. INSPECTION TYPE CODE -ICL-IN: IL=Illegal Operetion, MI=Monitoring, MP=Mineral Prospect, SI=Surety-related, PR=Preoperationl <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY CODE -ICL-AC: NO=None, BL=BLD1, CH=Colo. Dept. Health; CL=Land Board, <br />CT=Citizen; CW=Wildlife, FS=Forest Service, HW=Hwy. Dept., LC=Local Government, SE=State Engr.I <br />3. REASON FORINSPECTION CODE-iCL-RS:AG=Other Agency Request,CT=Citizen Complaint,tE=Normall&E Program,HP=High Priority, PY=Priority <br />4. WEATHER CODE -ICL-WE: CL=Cloudy, CR=CIeaq lN=Inclement-prevented inspection, RN=Raining, SN=Snowing, WD=Wfndyl <br />5. BOND CALCOLATION TYPE: -IBC=Complete Bond, BP=Partial Bond, NN=None) <br />This list identifies the environmental and permit parameters inspected and gives a categorical evaluation of each. IF PB <br />OR PV IS INDICATED, YOU SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE <br />COMPLIANCE WITH THE TERMS OF YOUR PERMIT AND APPLICABLE RULES AND REGULATIONS. If PV <br />is indicated, you will be notified under separate cover when the Mined Land reclamation Board will consider possible <br />enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR) RECORDS .................................... ~ (FN) FINANCIAL WARRANTY...... sL (RD) ROADS...................7L <br />(HB) HYDROLOGIC BALANCE ............... ~L (BG) BACKFILL & GRADING....... 1~IA (EX) EXPLOSIVES...........NA_ <br />(PW) PROCESSING WASTE/TAILING...... PiA (SF) PROCESSING FACILITIES..... 1~iA (TS) TOPSOIL .................5~ <br />(MP) GENL MINE PLAN COMPLIANCE... PIA (FW) FISH & WILDLIFE ............... (RV) REVEGETATION.....>`IA. <br />(SM) SIGNS AND MARKERS .................. Y (SP) STORM WATER MGT PLAN... NA (SB) COMPLETE INSP..... Y <br />(ES) OVERBURDEN/DEV. WASTE........... N~4 (SC) EROSION/SEDIMENTATION.. Y (RS) RECL PLAN/COMP...NA <br />(AT) ACID OR TOXIC MATERIALS......... NA (OD) OFF-SITE DAMAGE .............. NA (ST) STIPULATIONS........NA <br />Y =Inspected and Found in Compliance PV =Inspected and Possible Violations Noted PB = InspeMed end Problems Noted <br />N =Not Inspected NA =Not Applicable <br />