My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC08259
DRMS
>
Back File Migration
>
Inspection
>
INSPEC08259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:08:20 PM
Creation date
11/18/2007 8:35:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
8/11/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Condition of Condition of At least 60% <br /> <br />Outfall <br />Impoundment Estimated <br />dischazgel <br />dischazge <br />embatlkments and capacity <br />(visual <br /> structure inslopes <br />estimate ? <br /> Mine site, <br /> sewage <br /> treatment, <br />002 celll None Good Good N/A <br /> ce112 <br /> ce113 <br /> ce114 <br />CDPS Permit CO-0036684: <br />OOIA E, Sediment 0.009 cfs Good Good Yes <br />Other Impoundments <br />CDMG Disposa- Area None Good Good N/A <br />site 7 1, Stora e <br /> Preparation N/A Good Good N/A <br /> Plant, Sum <br /> Fish Creek <br /> Tipple, N/A (dry) Good Good N/A <br /> Sewage <br /> Eva oration <br /> <br />All discharges were cleaz. <br />The following sites where sediment control measures other than sedimentation ponds are used were inspected. <br />Descri tion Location <br /> <br />Rockdust Tank This azea of disturbance was inspected from the entrance to the site. The <br />sediment control measures a eared to be in ood re air. <br />Fish Creek Dewaterin Site Sediment control measures were in ood re air. <br />CYCC Office Building Sediment control measures were in good repair. This azea is programmed <br />for reclamation. <br />Sandstones Power Substation Sediment control measures were in ood re air. <br />Railroad S ur Extension Area Sediment control measures were in ood re air. <br />Stoker Coal Loadout Sediment control measures were in ood re air. <br />Overland Belt West Sediment control measures were in ood re air. <br />Stora e and Trainin Area Sediment control measures were in ood re air. <br />7 North Esca a Shaft Sediment control measures were in ood re air. <br />EMD Ventilation Shaft Sediment control measures were in ood re air <br />EMD Dewatering Treatment <br />Facili Sediment control measures were in good repair. <br />Rockfall Hazard Trenches These trenches were inspected from a distance. They appeazed to be in good i <br />re air. <br />NMD Power Borehole Sediment control measures were in ood re air. <br />NW Mains Ventilation Shaft The SAE sediment control facilities. See the ictures and discussion <br />C-1982-056. CC Inspection of August 11, 2005 Page 4 of 9 pages. BGW <br />
The URL can be used to link to this page
Your browser does not support the video tag.