Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />Sunoort Facilities <br />Removal of facilities, equipment and miscellaneous material is <br />continuing at the mine. Two of the trailers that were located on <br />the upper bench have been removed. Mr. Weaver informed me that <br />most of the items in the shop have been taken out. In the <br />Division's last inspection it was noted that three power poles <br />would have to be removed prior to beginning backfilling and grading <br />operations. I reminded Mr. Weaver of this and recommended that he <br />contact the power company and make arrangements to have the poles <br />removed. <br />CEJ/002INSP.925 <br />