Laserfiche WebLink
~, , r, <br />Page 40 <br />Construction Materials Rule 1 <br />(b) acceptance of the Notice of Temporary Cessation with <br />modifications and other necessary activities as established by the Boazd; <br />(c) determination that the mining operation is not in a state <br />of temporary cessation; or <br />(d) continuance of the matter for. another month or more to <br />allow the Operator to revise the Notice of Temporary Cessation and/or <br />to allow the Office staff to conduct a site inspection or otherwise review <br />the matter as necessary. <br />(3j When no reclamation or performance standard issues or <br />problems are indicated in the Notice of Temporary Cessation or by field or file <br />inspection, and no concerns aze expressed by interested persons, the Notice <br />shall not be placed on the agenda or heard by the Boazd. In such cases, the <br />county and appropriate municipality will be notified and the fact of the receipt <br />of the Notice by the Office will be acknowledged in the monthly activity report <br />attached to the monthly agenda. <br />1:13.7 Application Requirements -Substitute for Notice of Temporary <br />Cessation <br />tos~n>ro> Where certain muting operations have periods of inactivity exceeding one <br />hundred eighty (180) days, the Operator may include in the permit application, <br />amendment or technical revision, the utformation otherwise required when filing <br />a Notice of Temporary Cessation. (Please see Rules 6.3.3(1)(a) or 6.4.4(e).) <br />If approved by the Boazd or Office, such Notice in the permit shall serve as a <br />substitute for the Notice of Temporary Cessation with the following conditions: <br />(a) The Operator must report to the Boazd through the <br />Annual Report: <br />(i) the condition of the operation at the time of <br />cessation; <br />(ii) what specific measures have been and will be <br />implemented to comply with reclamation and performance <br />standards; and <br />