My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC07126
DRMS
>
Back File Migration
>
Inspection
>
INSPEC07126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:04:13 PM
Creation date
11/18/2007 8:30:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997084
IBM Index Class Name
Inspection
Doc Date
4/22/2004
Doc Name
Inspection Report
From
DMG
To
Horizon Ranch LLP
Inspection Date
4/9/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 04/22/2004 <br />User: WHE <br />State :Colorado Permitrob # : M-1997-084 <br />County :Ouray Abbreviation :none <br />Site :Memphis Site Filename : M084-001 <br />Agency or organization name : DMG <br />Permit or other job action :Routine 110c bond update <br />task description : Highwatl reduction from 0.5H:1 V to 3H:1 V <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Machine description :Cat 307C <br />Ownership cost/hour <br />Operating cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />Utilization <br />$11.45 NA <br />$11.32 100 <br />$32.02 NA <br />$54.79 <br />Horsepower: 55 <br />Weight (MT) : 6.49 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cosUhour : $54.79 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 47 LCY factor : NA volume : 47 LCY <br />Source of estimated volume :See attached drawing, "Highwatl Reduction" <br />Source of estimated swell factor:NA <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket, swinc loaded. dump bucket, swing empty) <br />Basic job condition description : ABOVE AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.21 minutes <br />Bucket Capacity <br />Rated bucket capacity : 0.59 LCY (heaped) Bucket size class : large <br />Bucket fill factor : 0.97 Sand and gravel (95 % - 100%) <br />Adjusted bucket capacity : 0.58 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,600 feet Altitude adjustment : 0.87 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shifdday) <br />Net job correction : 0.72 multiplier <br />Unadjusted hourly unit production : 164.36 LCY/hour <br />Adjusted hourly unit production : 118.68 LCY/hour <br />Adjusted hourly fleet production : 118.68 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 0.39 hours <br />Unit cost : $0.462 per LCY Total job cost : $QQ <br />
The URL can be used to link to this page
Your browser does not support the video tag.